Status
Comment
Login
Code 3901856
Name ARVOR-I Profiling Float
Description ARGO MOCCA - EU
Project MOCCA
MOCCA-EU
Euro-Argo
Institution Euro-Argo
Data Assembly Center IF : CORIOLIS
Activity Active
Status
Comment
First station date 09/08/2016 14:15:00
Last station date 25/07/2021 12:41:30
Float cycles 182, 181, 180, 179, 178, 177, 176, 175, 174, 173, 172, 171, 170, 169, 168, 167, 166, 165, 164, 163, 162, 161, 160, 159, 158, 157, 156, 155, 154, 153, 152, 151, 150, 149, 148, 147, 146, 145, 144, 143, 142, 141, 140, 139, 138, 137, 136, 135, 134, 133, 132, 131, 130, 129, 128, 127, 126, 125, 124, 123, 122, 121, 120, 119, 118, 117, 116, 115, 114, 113, 112, 111, 110, 109, 108, 107, 106, 105, 104, 103, 102, 101, 100, 99, 98, 97, 96, 95, 94, 93, 92, 91, 90, 89, 88, 87, 86, 85, 84, 83, 82, 81, 80, 79, 78, 77, 76, 75, 74, 73, 72, 71, 70, 69, 68, 67, 66, 65, 64, 63, 62, 61, 60, 59, 58, 57, 56, 55, 54, 53, 52, 51, 50, 49, 48, 47, 46, 45, 44, 43, 42, 41, 40, 39, 38, 37, 36, 35, 34, 33, 32, 31, 30, 29, 28, 27, 26, 25, 24, 23, 22, 21, 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, 1, 0
Stations in Ascii, in Netcdf
Trajectory data in Ascii, in Netcdf
Graphics of individual profiles Verticals profiles, Immersion profiles
Map
Float Argo trajectory for platform 3901856
(C) Coriolis data centre - 2021.07.28
T/S Diagram
Section chart
Overlayed profiles
Waterfall profiles
Configuration
Profiler TYPE PROVOR
Profiler VERSION 5.43
Profiler CYCLE PERIOD 10
Profiler IMMERSION DRIFT PERIOD 720
Profiler LAUNCH DATETIME 09/08/2016 13:21:00
Profiler LAUNCH LATITUDE 31.5726
Profiler LAUNCH LONGITUDE -39.4589
Profiler PROBE CODE 844
Profiler RECORDER CODE 64
Profiler EXPERIMENT ID Euro-Argo
Profiler EXPERIMENT ID MOCCA
Profiler EXPERIMENT ID MOCCA-EU
Profiler PARKING DEPTH 1000
Profiler PROFILE DEPTH 2000
Platform activity flag A
The last valid station id of the platform 79745588
Bathy 3108
Profiler configuration - Reference day 1
Data centre in charge of platform data processing IF
Positioning system GPS
Positioning system IRIDIUM
Transmission identifier (ARGOS, ORBCOMM, etc.) 390927
The telecommunications system used IRIDIUM
Model of the float ARVOR
The name of the manufacturer NKE
Instrument type AI2600-16FR019
Direction of the profiles B
Name of the principal investigator Romain Cancouet
Quality on launch date, time and location 1
Date (UTC) of the first descent of the float. 09/08/2016 13:15:00
Quality on start date 1
Identifier of the deployment platform PELAGIA
Identifier of stations used to verify the first profile no
The number of times this cycle repeats 1
Name of the cruise Transit
Name of the project MOCCA
Date of last update of the metadata of the platform 17/08/2016 21:00:00
Date of last update of the trajectory of the platform 25/07/2021 15:36:10
Version number of the data handbook 1.2
Theoretical time of end of ascent to surface 12
Profiler configuration - Periode de transmission en fin de vie (minute) 720
Profiler configuration - Duree maxi d activation ev en surface (cs) 800
Profiler configuration - Volume transfere par l ev maxi autorise en profondeur (cm3) 11
Profiler configuration - Duree maxi d activation pompe en profondeur (cs) 290
Profiler configuration - Duree maxi d activation pompe en remontee (cs) 720
Profiler configuration - Dur?e nominale d activation pompe en emergence (cs) 30000
Profiler configuration - Tolerance sur l atteinte de la pression de consigne (dBar) 30
Profiler configuration - Pression maxi a ne pas depasser (dBar) 2100
Profiler configuration - Pression de debut de reduction de la duree d activation ev en surface (dBar) 1
Profiler configuration - Critere de pression de debut de plongee (dBar) 7
Profiler configuration - Nbre de positions hors tolerance autorise en derive conduisant a repositionnement 2
Profiler configuration - Mode de gestion de l echouage en descente a pression de derive 0
Profiler configuration - Critere d echouage: volume cumule (cm3) 36
Profiler configuration - Pression en dessous de laquelle le flotteur reste pose en attente profil remontee (dBar) 200
Profiler configuration - Diminution de la pression visee en cas d echouage (dBar) 100
Profiler configuration - Tolerance sur maintien de la pression de consigne (dBar) 50
Profiler configuration - Mode d acquisition de la mesure 1
Profiler configuration - Periode d alternance profil - si=1, pas d alternance (jour) 1
Profiler configuration - Profondeur de profil alterne (dBar) 2000
Profiler configuration - Vitesse moyenne descente (mm/s) 25
Profiler configuration - Increment de profondeur de consigne a chaque cycle (dBar) 0
Profiler configuration - Coefficient de calibrage pression A 1.175
Profiler configuration - Coefficient de calibrage pression B -24.49
List of parameters with real-time calibration information PSAL
Calibration equation for this parameter PSAL_ADJUSTED = a1 * PSAL + a0
Calibration coefficients for this equation a1=1, a0=-0.0103
Comment applying to this parameter calibration Real-time salinity adjustment
Date of the calibration 20210506000000
Firmware version 5900A00
The manual version for the float 33-16-033
A standard format number to describe the data format for each float 102005
The configuration of battery packs in the float 2 WILPA1621A
The type of controller board I535
The serial number of the primary controller board C148112-0019
The float owner Euro-Argo
The operating institution of the float Euro-Argo
Delay Before Mission 0
Period Descent Profile 0
Period Ascent Profile 10
INTERMEDIATE SURFACE THRESHOLD 250
Depth intermediate threshold 1400
Surface Slice Thickness 1
Intermediate Slice Thickness 2
Depth Slice Thickness 4
Optode type 0
Average ascent speed 90
CTD cut-off pressure 2
maximum cycles 500
Category of instrument FLOAT
Id of the sail connector 16FR019
Number of the bluetooth connection 2016 02 019
Firmware checksum 3810
Comment on float visual inspection done just before deployment OK
Comment on ballast visual inspection done just before deployment OK
Startup date of the float 09/08/2016 13:15:00
Description of the float buoyancy just after deployment OK
Name of the deployment operator B. Puijman
Method used to deploy the float MANUAL
Comment on the float deployment Wind E 2/3 Bf.
Comment on float visual inspection done during acceptance tests OK
Comment on ballast visual inspection done during acceptance tests OK
Float firmware version during acceptance tests 5900A00
Float firmware checksum during acceptance tests 5CD4
Float clock set at the beginning of the acceptance tests yes
Float battery voltage measured at the beginning of the acceptance tests 10.7
Float internal vacuum measured with a full bladder at the beginning of the acceptance tests 602
Spy mode set to ON at the beginning of the acceptance tests OK
Show mode set to OFF at the beginning of the acceptance tests OK
Mission armed at the beginning of the acceptance tests OK
Startup date of the float for acceptance tests 23/05/2016 10:00:00
Float battery voltage measure at the end of the acceptance tests 10.6
Float internal vacuum measured during the acceptance tests 602
Comment on internal vacuums measured during the acceptance tests OK
General comments on the acceptance tests OK
Comment on float visual inspection done during the pre-deployment check OK
Comment on ballast visual inspection done during the pre-deployment check OK
Float battery voltage measured during the pre-deployment check 10.6
Float internal vacuum measured during the pre-deployment check 604
Comment on internal vacuums measured during the acceptance tests OK
Spy mode set to ON during the pre-deployment check OK
Show mode set to OFF during the pre-deployment check OK
Mission armed during the pre-deployment check OK
General comments on the pre-deployment check OK
Period of the pressure checks during the float ascent to surface 2
pression stab remontée 10
Platform type ARVOR
Time delay between each new attempt to descend when the float is stuck at the surface. 30
Threshold used by the float to stop ascent speed control and pump actions. 10
1 if the float transmits hydraulic data at the end of the cycle, 0 otherwise. 1
Delay before a second Iridium session performed by the float just before diving for a new cycle. 0
Type of sensor from L22 SeaVox Device Catalogue TOOL0669
Number of cycles for the first mission of a double mission Argos float (Arvor ARN 2013) 0
Comment on float internal checks before deployment (valve and pump actions, argos transmission check) OK
Ship speed during float deployment (kts) 1
Wind speed during float deplayment (Beaufort) 2
Float clock value set during acceptance tests (dd/mm/yyyy hh:mm) ('!TI') 23/05/2016 10:00:00
PRES measurement done before acceptance deployment 0
TEMP measurement done before acceptance deployment 19.536
PSAL measurement done before acceptance deployment 0
Comment on float internal checks before acceptance deployment (valve and pump actions, argos transmission check) OK
Buoyancy description before acceptance deployment Water @ top of buoyancy foam
Buoyancy description after acceptance deployment Water @ 0.5 cm above top of P sensor
PRES measurement done after acceptance deployment 0
TEMP measurement done after acceptance deployment 21.688
PSAL measurement done after acceptance deployment 0
Float firmware version at pre-deployment 5900A00
PRES measurement done during pre-deployment tests 0
TEMP measurement done during pre-deployment tests 21.688
PSAL measurement done during pre-deployment tests 0
Float waiting period before the surface ResetOffset CTD command (Arvor ARN 2013) 0
Timeout for GPS acquisition. 36
Cycle periodicity of the 'in air measurement' phase. 0
Sampling period during the 'in air measurement' phase. 30
Duration of the 'in air measurement' phase. 5
Duration of the last pump action of the buoyancy acquisition phase when a 'in air measurement' phase is programmed (in centi-seconds). 33000
Date of last update of the tech data of the platform 25/07/2021 15:43:49
Configuration phases
Total time of a cycle : descent + parking + ascent + surface Preset duration of the down time (start of descent to start of ascent) Preset duration of the up time (start of ascent to start of descent) Pressure of subsurface drifts Deepest pressure sampled in the ascending profile
240 1000 2000
240 1000 2000
Sensors
Name Maker Model Serial number Units Accuracy Resolution
CTD_PRES KISTLER KISTLER_2900PSIA 4708602
CTD_TEMP SBE SBE41CP_V7.2.5 8094
CTD_CNDC SBE SBE41CP_V7.2.5 8094
Physical parameters
Name Units Accuracy Resolution
CTD_PRES decibar 2.4 0.1
CTD_TEMP degree_Celsius 0.002 0.001
CTD_CNDC mS.cm-1 0.005 0.001
Calibrations
Parameter Equation Coefficients Comment
PRES
TEMP
PSAL
Technical parameters Details