Status
Comment
Login
Code 3901983
Name ARVOR Profiling Float
Description ARGO MOCCA - EU
Project MOCCA-EU
Institution Euro-Argo
Data Assembly Center BO : BODC
Activity Active
Status
Comment
First station date 29/04/2018 12:00:00
Last station date 09/06/2021 02:45:30
Float cycles 137, 136, 135, 134, 133, 132, 131, 130, 129, 128, 127, 126, 125, 124, 123, 122, 121, 120, 119, 118, 117, 116, 115, 114, 113, 112, 111, 110, 109, 108, 107, 106, 105, 104, 103, 102, 101, 100, 99, 98, 97, 96, 95, 94, 93, 92, 91, 90, 89, 88, 87, 86, 85, 84, 83, 82, 81, 80, 79, 78, 77, 76, 75, 74, 73, 72, 71, 70, 69, 68, 67, 66, 65, 64, 63, 62, 61, 60, 59, 58, 57, 56, 55, 54, 53, 52, 51, 50, 49, 48, 47, 46, 45, 44, 43, 42, 41, 40, 39, 38, 37, 36, 35, 34, 33, 32, 31, 30, 29, 28, 27, 26, 25, 24, 23, 22, 21, 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, 1, 0
Stations in Ascii, in Netcdf
Trajectory data in Ascii, in Netcdf
Graphics of individual profiles Verticals profiles, Immersion profiles
Map
Float Argo trajectory for platform 3901983
(C) Coriolis data centre - 2021.06.13
T/S Diagram
Section chart
Overlayed profiles
Waterfall profiles
Configuration
Profiler TYPE PROVOR
Profiler VERSION 5.44
Profiler CYCLE PERIOD 0.66666666667
Profiler CYCLE PERIOD 10
Profiler IMMERSION DRIFT PERIOD 360
Profiler LAUNCH DATETIME 29/04/2018 11:10:00
Profiler LAUNCH LATITUDE -1.3168
Profiler LAUNCH LONGITUDE -39.5187
Profiler PROBE CODE 844
Profiler RECORDER CODE 64
Profiler EXPERIMENT ID MOCCA-EU
Profiler PARKING DEPTH 1000
Profiler PROFILE DEPTH 1000
Profiler PROFILE DEPTH 2000
Platform activity flag A
The last valid station id of the platform 77635064
Bathy 3698
Profiler configuration - Reference day 1
Data centre in charge of platform data processing BO
Positioning system IRIDIUM
Transmission identifier (ARGOS, ORBCOMM, etc.) 480818i
The telecommunications system used IRIDIUM
The program identifier used by the transmission system f480818
Model of the float ARVOR
The name of the manufacturer NKE
Instrument type AI2600-16FR126
Direction of the profiles B
Name of the principal investigator Josep Lluis Pelegri
Quality on launch date, time and location 1
Date (UTC) of the first descent of the float. 29/04/2018 00:00:00
Quality on start date 1
Identifier of the deployment platform RV HESPERIDES
Status of the end of mission of the float
The number of times this cycle repeats 1
Name of the cruise RETRO-EZR
Name of the project MOCCA-EU
The related loading id 61768642
Date of last update of the metadata of the platform 09/06/2021 06:43:06
Date of last update of the trajectory of the platform 09/06/2021 07:32:16
Version number of the data handbook 1.2
Theoretical time of end of ascent to surface 3
Profiler configuration - Periode de transmission en fin de vie (minute) 60
Profiler configuration - Duree maxi d activation ev en surface (cs) 800
Profiler configuration - Volume transfere par l ev maxi autorise en profondeur (cm3) 11
Profiler configuration - Duree maxi d activation pompe en profondeur (cs) 290
Profiler configuration - Duree maxi d activation pompe en remontee (cs) 720
Profiler configuration - Dur?e nominale d activation pompe en emergence (cs) 30000
Profiler configuration - Tolerance sur l atteinte de la pression de consigne (dBar) 30
Profiler configuration - Pression maxi a ne pas depasser (dBar) 2100
Profiler configuration - Pression de debut de reduction de la duree d activation ev en surface (dBar) 1
Profiler configuration - Critere de pression de debut de plongee (dBar) 7
Profiler configuration - Nbre de positions hors tolerance autorise en derive conduisant a repositionnement 2
Profiler configuration - Mode de gestion de l echouage en descente a pression de derive 0
Profiler configuration - Critere d echouage: volume cumule (cm3) 36
Profiler configuration - Pression en dessous de laquelle le flotteur reste pose en attente profil remontee (dBar) 200
Profiler configuration - Diminution de la pression visee en cas d echouage (dBar) 100
Profiler configuration - Tolerance sur maintien de la pression de consigne (dBar) 50
Profiler configuration - Mode d acquisition de la mesure 1
Profiler configuration - Periode d alternance profil - si=1, pas d alternance (jour) 1
Profiler configuration - Profondeur de profil alterne (dBar) 2000
Profiler configuration - Vitesse moyenne descente (mm/s) 25
Profiler configuration - Increment de profondeur de consigne a chaque cycle (dBar) 0
Profiler configuration - Coefficient de calibrage pression A 1.222
Profiler configuration - Coefficient de calibrage pression B -101.34
List of parameters with real-time calibration information PSAL
Calibration equation for this parameter PSAL_ADJUSTED = a1 * PSAL + a0
Calibration coefficients for this equation a1=1, a0=0.0000
Comment applying to this parameter calibration Real-time salinity adjustment
Date of the calibration 20190908000000
Firmware version 5900A01
The manual version for the float 33-16-033
The serial number of the float AI2600-16FR126
A standard format number to describe the data format for each float 102005
The format number used by the DAC to describe the data format type for each float N33AR
The type of battery packs in the float Lithium
The configuration of battery packs in the float 2 WILPA1621A
The type of controller board I535
The float owner EURO-ARGO
The operating institution of the float EURO-ARGO
Delay Before Mission 30
Period Descent Profile 0
Period Ascent Profile 10
INTERMEDIATE SURFACE THRESHOLD 250
Depth intermediate threshold 500
Surface Slice Thickness 1
Intermediate Slice Thickness 2
Depth Slice Thickness 4
Optode type 0
Average ascent speed 90
CTD cut-off pressure 2
maximum cycles 500
Category of instrument FLOAT
Id of the sail connector EZR4
Number of the bluetooth connection 2016 02 126
Firmware checksum C95A
Comment on float visual inspection done just before deployment OK
Comment on ballast visual inspection done just before deployment OK
Description of the float buoyancy just after deployment OK
Name of the deployment operator Kintxo Salvador
Method used to deploy the float MANUAL
Comment on the float deployment CTD n°EZR 12
Comment on float visual inspection done during acceptance tests OK
Comment on ballast visual inspection done during acceptance tests OK
Float firmware version during acceptance tests 5900A01
Float firmware checksum during acceptance tests C95A
Float clock set at the beginning of the acceptance tests no
Float battery voltage measured at the beginning of the acceptance tests 10.9
Float internal vacuum measured with a full bladder at the beginning of the acceptance tests 623
Spy mode set to ON at the beginning of the acceptance tests OK
Show mode set to OFF at the beginning of the acceptance tests OK
Mission armed at the beginning of the acceptance tests OK
Startup date of the float for acceptance tests 14/11/2016 09:00:00
Drift of the float clock during acceptance tests N/A
Float battery voltage measure at the end of the acceptance tests 10.8
Float internal vacuum measured during the acceptance tests 609
Comment on internal vacuums measured during the acceptance tests OK
General comments on the acceptance tests OK
Comment on float visual inspection done during the pre-deployment check OK
Comment on ballast visual inspection done during the pre-deployment check OK
Float clock set during the pre-deployment check OK
Float battery voltage measured during the pre-deployment check 10.9
Float internal vacuum measured during the pre-deployment check 601
Comment on internal vacuums measured during the acceptance tests OK
Spy mode set to ON during the pre-deployment check OK
Show mode set to OFF during the pre-deployment check OK
Mission armed during the pre-deployment check OK
General comments on the pre-deployment check OK
Period of the pressure checks during the float ascent to surface 2
pression stab remontée 10
Platform type ARVOR
Time delay between each new attempt to descend when the float is stuck at the surface. 30
Threshold used by the float to stop ascent speed control and pump actions. 10
1 if the float transmits hydraulic data at the end of the cycle, 0 otherwise. 1
Delay before a second Iridium session performed by the float just before diving for a new cycle. 0
Type of sensor from L22 SeaVox Device Catalogue TOOL0669
Type of sensor from L22 SeaVox Device Catalogue TOOL0837
Number of cycles for the first mission of a double mission Argos float (Arvor ARN 2013) 15
Comment on float internal checks before deployment (valve and pump actions, argos transmission check) OK
Float deployment height (m) 1
Ship speed during float deployment (kts) 1.5
Wind speed during float deplayment (Beaufort) 4
Sea state during float deployment (calm, smooth, slight, moderate, rough, very rough, high, very high, phenomenal) Smooth (0.1 to 0.5 m)
Float clock value set during acceptance tests (dd/mm/yyyy hh:mm) ('!TI') N/A
PRES measurement done before acceptance deployment 0
TEMP measurement done before acceptance deployment 22.898
PSAL measurement done before acceptance deployment 11
Comment on float internal checks before acceptance deployment (valve and pump actions, argos transmission check) OK
Buoyancy description before acceptance deployment Water @ top of buoyancy foam
Buoyancy description after acceptance deployment Water @ 0.5 cm above top of P sensor
PRES measurement done after acceptance deployment -1
TEMP measurement done after acceptance deployment 13.957
PSAL measurement done after acceptance deployment 0
Float firmware version at pre-deployment 5900A01
Float clock value set during pre-deployment (dd/mm/yyyy hh:mm) ('!TI') N/A
PRES measurement done during pre-deployment tests -3
TEMP measurement done during pre-deployment tests 12.305
PSAL measurement done during pre-deployment tests 6
Float waiting period before the surface ResetOffset CTD command (Arvor ARN 2013) 0
Timeout for GPS acquisition. 36
Cycle periodicity of the 'in air measurement' phase. 0
Sampling period during the 'in air measurement' phase. 30
Duration of the 'in air measurement' phase. 5
Duration of the last pump action of the buoyancy acquisition phase when a 'in air measurement' phase is programmed (in centi-seconds). 33000
Date of last update of the tech data of the platform 09/06/2021 07:32:40
Configuration phases
Total time of a cycle : descent + parking + ascent + surface Preset duration of the down time (start of descent to start of ascent) Preset duration of the up time (start of ascent to start of descent) Pressure of subsurface drifts Deepest pressure sampled in the ascending profile
16 1000 1000
240 1000 2000
Sensors
Name Maker Model Serial number Units Accuracy Resolution
CTD_PRES DRUCK DRUCK_2900PSIA 10300979
CTD_TEMP SBE SBE41CP_V7.2.5 8752
CTD_CNDC SBE SBE41CP_V7.2.5 8752
Physical parameters
Name Units Accuracy Resolution
CTD_PRES decibar 2.4 0.1
CTD_TEMP degree_Celsius 0.002 0.001
CTD_CNDC psu 0.005 0.001
Calibrations
Parameter Equation Coefficients Comment
PRES none none
TEMP none none
PSAL none none
Technical parameters Details