Status
Comment
Login
Code 6902684
Name ARVOR Profiling Float
Description CORIOLIS - RREX ASFAR
Project RREX ASFAR
Institution IFREMER, Institut Français de Recherche pour l'Exploitation de la Mer
Data Assembly Center IF : CORIOLIS
Activity Active
Status
Comment
First station date 15/11/2016 17:26:00
Last station date 12/06/2021 01:36:00
Float cycles 168, 167, 166, 165, 164, 163, 162, 161, 160, 159, 158, 157, 156, 155, 154, 153, 152, 151, 150, 149, 148, 147, 146, 145, 144, 143, 142, 141, 140, 139, 138, 137, 136, 135, 134, 133, 132, 131, 130, 129, 128, 127, 126, 125, 124, 123, 122, 121, 120, 119, 118, 117, 116, 115, 114, 113, 112, 111, 110, 109, 108, 107, 106, 105, 104, 103, 102, 101, 100, 99, 98, 97, 96, 95, 94, 93, 92, 91, 90, 89, 88, 87, 86, 85, 84, 83, 82, 81, 80, 79, 78, 77, 76, 75, 74, 73, 72, 71, 70, 69, 68, 67, 66, 65, 64, 63, 62, 61, 60, 59, 58, 57, 56, 55, 54, 53, 52, 51, 50, 49, 48, 47, 46, 45, 44, 43, 42, 41, 40, 39, 38, 37, 36, 35, 34, 33, 32, 31, 30, 29, 28, 27, 26, 25, 24, 23, 22, 21, 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, 1
Stations in Ascii, in Netcdf
Trajectory data in Ascii, in Netcdf
Graphics of individual profiles Verticals profiles, Immersion profiles
Map
Float Argo trajectory for platform 6902684
(C) Coriolis data centre - 2021.06.13
T/S Diagram
Section chart
Overlayed profiles
Waterfall profiles
Configuration
Profiler TYPE PROVOR
Profiler VERSION 4.53
Profiler CRC TYPE 16
Profiler CYCLE PERIOD 10
Profiler IMMERSION DRIFT PERIOD 720
Profiler LAUNCH DATETIME 15/11/2016 10:00:00
Profiler LAUNCH LATITUDE 58.5446
Profiler LAUNCH LONGITUDE -30.1872
Profiler REFERENCE DATETIME 15/11/2016 00:00:00
Profiler REFERENCE INTERNAL DATE 24425
Profiler PROBE CODE 844
Profiler EXPERIMENT ID RREX ASFAR
Profiler CONDUCTIVITY ACCURACY 2
Profiler PARKING DEPTH 1000
Profiler PROFILE DEPTH 2000
Platform activity flag A
The last valid station id of the platform 77661048
Bathy 1848
Profiler configuration - Reference day 0
Data centre in charge of platform data processing IF
Positioning system ARGOS
Transmission identifier (ARGOS, ORBCOMM, etc.) 150953
The telecommunications system used ARGOS
The program identifier used by the transmission system 2412
The frequency of transmission from the float 401 653 000
The repetition rate of transmission from the float 40
Model of the float ARVOR
The name of the manufacturer NKE
Instrument type OIN-15-AR-31
Direction of the profiles B
Name of the principal investigator Virginie THIERRY
Quality on launch date, time and location 1
Date (UTC) of the first descent of the float. 15/11/2016 10:00:00
Quality on start date 1
Identifier of the deployment platform SARMIENTO DE GAMBOA
Identifier of stations used to verify the first profile no
The number of times this cycle repeats 1
Name of the cruise RREX-BOCATS
Date of last update of the metadata of the platform 22/11/2016 15:00:00
Date of last update of the trajectory of the platform 03/06/2021 09:34:19
Version number of the data handbook 1.2
Theoretical time of end of ascent to surface 0
Profiler configuration - Periode de transmission en fin de vie (minute) 100
Profiler configuration - Duree maxi d activation ev en surface (cs) 800
Profiler configuration - Volume transfere par l ev maxi autorise en profondeur (cm3) 11
Profiler configuration - Duree maxi d activation pompe en profondeur (cs) 290
Profiler configuration - Duree maxi d activation pompe en remontee (cs) 720
Profiler configuration - Dur?e nominale d activation pompe en emergence (cs) 24000
Profiler configuration - Tolerance sur l atteinte de la pression de consigne (dBar) 30
Profiler configuration - Pression maxi a ne pas depasser (dBar) 2100
Profiler configuration - Pression de debut de reduction de la duree d activation ev en surface (dBar) 1
Profiler configuration - Critere de pression de debut de plongee (dBar) 7
Profiler configuration - Nbre de positions hors tolerance autorise en derive conduisant a repositionnement 2
Profiler configuration - Mode de gestion de l echouage en descente a pression de derive 0
Profiler configuration - Critere d echouage: volume cumule (cm3) 36
Profiler configuration - Pression en dessous de laquelle le flotteur reste pose en attente profil remontee (dBar) 200
Profiler configuration - Diminution de la pression visee en cas d echouage (dBar) 100
Profiler configuration - Tolerance sur maintien de la pression de consigne (dBar) 50
Profiler configuration - Mode d acquisition de la mesure 1
Profiler configuration - Periode d alternance profil - si=1, pas d alternance (jour) 1
Profiler configuration - Profondeur de profil alterne (dBar) 2000
Profiler configuration - Vitesse moyenne descente (mm/s) 27
Profiler configuration - Increment de profondeur de consigne a chaque cycle (dBar) 0
Profiler configuration - Coefficient de calibrage pression A 1.312
Profiler configuration - Coefficient de calibrage pression B -76.6
List of parameters with real-time calibration information PSAL
Calibration equation for this parameter PSAL_ADJUSTED = a1 * PSAL + a0
Calibration coefficients for this equation a1=1, a0=0.0000
Comment applying to this parameter calibration Real-time salinity adjustment
Date of the calibration 20180419000000
Firmware version 5611A01
The manual version for the float 33-16-003
A standard format number to describe the data format for each float 102003
The configuration of battery packs in the float 2 WILPA1621A
The type of controller board I535
The serial number of the primary controller board C138177-0126
The float owner IFREMER
The operating institution of the float IFREMER
Delay Before Mission 0
Period Descent Profile 0
Period Ascent Profile 10
INTERMEDIATE SURFACE THRESHOLD 10
Depth intermediate threshold 500
Surface Slice Thickness 1
Intermediate Slice Thickness 10
Depth Slice Thickness 25
PRES when the SBE pump is switched off 5
CTD cut-off pressure 2
preset duration of the 'up' time (start of ascent to start of descent) 5.5
maximum cycles 500
Argos telemetry repetition 25
Argos transmission min time 6
Prelude duration 0
Category of instrument FLOAT
Id of the sail connector 15AR31
Number of the bluetooth connection 2015 04 126
Firmware checksum OK
Comment on float visual inspection done just before deployment OK
Comment on ballast visual inspection done just before deployment OK
Startup date of the float 15/11/2016 10:00:00
Name of the deployment operator S. LEIZOUR
Method used to deploy the float ASFAR Deployment
Comment on the float deployment ASFAR Deployment from bottom mooring
Hex value of the transmission identifier E200C98
Comment on float visual inspection done during acceptance tests OK
Comment on ballast visual inspection done during acceptance tests OK
Float firmware version during acceptance tests 5605A07
Float firmware checksum during acceptance tests B261
Float clock set at the beginning of the acceptance tests yes
Float battery voltage measured at the beginning of the acceptance tests 40.6
Float internal vacuum measured with a full bladder at the beginning of the acceptance tests 590
Spy mode set to ON at the beginning of the acceptance tests OK
Show mode set to OFF at the beginning of the acceptance tests OK
Mission armed at the beginning of the acceptance tests OK
Startup date of the float for acceptance tests 07/12/2015 09:00:00
Drift of the float clock during acceptance tests 0
Float battery voltage measure at the end of the acceptance tests 10.8
Float internal vacuum measured during the acceptance tests 610
Comment on internal vacuums measured during the acceptance tests OK
General comments on the acceptance tests OK
Comment on float visual inspection done during the pre-deployment check OK
Comment on ballast visual inspection done during the pre-deployment check OK
Float clock set during the pre-deployment check NO
Spy mode set to ON during the pre-deployment check OK
Show mode set to OFF during the pre-deployment check OK
Mission armed during the pre-deployment check OK
General comments on the pre-deployment check Flashed YLA5611A01 and programmed ASFAR after acceptance passed
Platform type ARVOR
Type of sensor from L22 SeaVox Device Catalogue TOOL0669
Sea state during float deployment (calm, smooth, slight, moderate, rough, very rough, high, very high, phenomenal) N/A
Float clock value set during acceptance tests (dd/mm/yyyy hh:mm) ('!TI') 07/12/2015 08:00:00
PRES measurement done before acceptance deployment 0
TEMP measurement done before acceptance deployment 13.345
PSAL measurement done before acceptance deployment 98
Comment on float internal checks before acceptance deployment (valve and pump actions, argos transmission check) OK
Buoyancy description before acceptance deployment Water @ top of buoyancy foam
Buoyancy description after acceptance deployment Water @ 0.5 cm above top of P sensor
PRES measurement done after acceptance deployment 0
TEMP measurement done after acceptance deployment 12.599
PSAL measurement done after acceptance deployment 0
Float firmware version at pre-deployment 5611A01
Date of last update of the tech data of the platform 03/06/2021 11:35:16
Configuration phases
Total time of a cycle : descent + parking + ascent + surface Preset duration of the down time (start of descent to start of ascent) Preset duration of the up time (start of ascent to start of descent) Pressure of subsurface drifts Deepest pressure sampled in the ascending profile
240 1000 2000
Sensors
Name Maker Model Serial number Units Accuracy Resolution
CTD_PRES KISTLER KISTLER_2900PSIA 4673527
CTD_TEMP SBE SBE41CP_V2 7420
CTD_CNDC SBE SBE41CP_V2 7420
Physical parameters
Name Units Accuracy Resolution
CTD_PRES decibar 2.4 0.1
CTD_TEMP degree_Celsius 0.002 0.001
CTD_CNDC mS.cm-1 0.005 0.001
Calibrations
Parameter Equation Coefficients Comment
PRES
TEMP
PSAL
Technical parameters Details