Status
Comment
Login
Code 6902842
Name ARVOR Profiling Float
Description CORIOLIS
Project CORIOLIS
Institution SHOM, Service Hydrographique et Oceanographique de la Marine
Data Assembly Center IF : CORIOLIS
Activity Inactive
Status
Comment
First station date 21/06/2019 12:57:00
Last station date 28/05/2021 04:09:00
Float cycles 142, 141, 140, 139, 138, 137, 136, 135, 134, 133, 132, 131, 130, 129, 128, 127, 126, 125, 124, 123, 122, 121, 120, 119, 118, 117, 116, 115, 114, 113, 112, 111, 110, 109, 108, 107, 106, 105, 104, 103, 102, 101, 100, 99, 98, 97, 96, 95, 94, 93, 92, 91, 90, 89, 88, 87, 86, 85, 84, 83, 82, 81, 80, 79, 78, 77, 76, 75, 74, 73, 72, 71, 70, 69, 68, 67, 66, 65, 64, 63, 62, 61, 60, 59, 58, 57, 56, 55, 54, 53, 52, 51, 50, 49, 48, 47, 46, 45, 44, 43, 42, 41, 40, 39, 38, 37, 36, 35, 34, 33, 32, 31, 30, 29, 28, 27, 26, 25, 24, 23, 22, 21, 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, 1, 0
Stations in Ascii, in Netcdf
Trajectory data in Ascii, in Netcdf
Graphics of individual profiles Verticals profiles, Immersion profiles
Map
Float Argo trajectory for platform 6902842
(C) Coriolis data centre - 2021.08.01
T/S Diagram
Section chart
Overlayed profiles
Waterfall profiles
Configuration
Profiler TYPE PROVOR
Profiler VERSION 4.52
Profiler CRC TYPE 16
Profiler CYCLE PERIOD 5
Profiler IMMERSION DRIFT PERIOD 720
Profiler LAUNCH DATETIME 21/06/2019 09:11:00
Profiler LAUNCH LATITUDE 41.2338
Profiler LAUNCH LONGITUDE 6.9203
Profiler REFERENCE DATETIME 23/06/2019 00:00:00
Profiler REFERENCE INTERNAL DATE 25375
Profiler PROBE CODE 844
Profiler EXPERIMENT ID CORIOLIS
Profiler CONDUCTIVITY ACCURACY 2
Profiler PARKING DEPTH 1000
Profiler PROFILE DEPTH 2000
Platform activity flag I
The last valid station id of the platform 77491874
Bathy 2730
Profiler configuration - Reference day 2
Data centre in charge of platform data processing IF
Positioning system ARGOS
Transmission identifier (ARGOS, ORBCOMM, etc.) 33988
The telecommunications system used ARGOS
The program identifier used by the transmission system 31170
The frequency of transmission from the float 401 653 000
The repetition rate of transmission from the float 40
Model of the float ARVOR LIGHT
The name of the manufacturer NKE
Instrument type AL2500-17FR013
Direction of the profiles B
Name of the principal investigator Christine COATANOAN
Quality on launch date, time and location 1
Date (UTC) of the first descent of the float. 21/06/2019 17:53:00
Quality on start date 1
Identifier of the deployment platform THALASSA
Identifier of stations used to verify the first profile CTD nearby
The number of times this cycle repeats 1
Name of the cruise MOOSE 2019
Date of last update of the metadata of the platform 27/06/2019 20:00:00
Date of last update of the trajectory of the platform 12/06/2021 00:33:18
Version number of the data handbook 1.2
Theoretical time of end of ascent to surface 3
Profiler configuration - Periode de transmission en fin de vie (minute) 100
Profiler configuration - Duree maxi d activation ev en surface (cs) 800
Profiler configuration - Volume transfere par l ev maxi autorise en profondeur (cm3) 11
Profiler configuration - Duree maxi d activation pompe en profondeur (cs) 290
Profiler configuration - Duree maxi d activation pompe en remontee (cs) 720
Profiler configuration - Dur?e nominale d activation pompe en emergence (cs) 24000
Profiler configuration - Tolerance sur l atteinte de la pression de consigne (dBar) 30
Profiler configuration - Pression maxi a ne pas depasser (dBar) 2100
Profiler configuration - Pression de debut de reduction de la duree d activation ev en surface (dBar) 1
Profiler configuration - Critere de pression de debut de plongee (dBar) 7
Profiler configuration - Nbre de positions hors tolerance autorise en derive conduisant a repositionnement 2
Profiler configuration - Mode de gestion de l echouage en descente a pression de derive 0
Profiler configuration - Critere d echouage: volume cumule (cm3) 36
Profiler configuration - Pression en dessous de laquelle le flotteur reste pose en attente profil remontee (dBar) 200
Profiler configuration - Diminution de la pression visee en cas d echouage (dBar) 100
Profiler configuration - Tolerance sur maintien de la pression de consigne (dBar) 50
Profiler configuration - Mode d acquisition de la mesure 1
Profiler configuration - Periode d alternance profil - si=1, pas d alternance (jour) 1
Profiler configuration - Profondeur de profil alterne (dBar) 2000
Profiler configuration - Vitesse moyenne descente (mm/s) 25
Profiler configuration - Increment de profondeur de consigne a chaque cycle (dBar) 0
Profiler configuration - Coefficient de calibrage pression A 1.274
Profiler configuration - Coefficient de calibrage pression B -201.06
Firmware version 5605B04
The manual version for the float 33-16-026
A standard format number to describe the data format for each float 102003
The configuration of battery packs in the float 2 WILPA2234
The type of controller board I535
The serial number of the primary controller board C150573-0083
The float owner SHOM
The operating institution of the float IFREMER
Delay Before Mission 0
Period Descent Profile 0
Period Ascent Profile 10
INTERMEDIATE SURFACE THRESHOLD 10
Depth intermediate threshold 200
Surface Slice Thickness 1
Intermediate Slice Thickness 10
Depth Slice Thickness 25
PRES when the SBE pump is switched off 5
Optode type 0
Average ascent speed 90
CTD cut-off pressure 2
preset duration of the 'up' time (start of ascent to start of descent) 5.5
maximum cycles 500
Argos telemetry repetition 25
Argos transmission min time 7
Prelude duration 180
Category of instrument FLOAT
Id of the sail connector AL2500-17FR013
Number of the bluetooth connection 2016 11 0083
Firmware checksum OK
Comment on float visual inspection done just before deployment OK
Comment on ballast visual inspection done just before deployment OK
Startup date of the float 21/06/2019 08:53:00
Description of the float buoyancy just after deployment OK
Name of the deployment operator WAGENER
Method used to deploy the float MANUAL
Hex value of the transmission identifier 07E094C
Comment on float visual inspection done during acceptance tests OK
Comment on ballast visual inspection done during acceptance tests OK
Float firmware version during acceptance tests 5605B04
Float firmware checksum during acceptance tests DDDF
Float clock set at the beginning of the acceptance tests YES
Float battery voltage measured at the beginning of the acceptance tests 10.6
Float internal vacuum measured with a full bladder at the beginning of the acceptance tests 610
Spy mode set to ON at the beginning of the acceptance tests OK
Show mode set to OFF at the beginning of the acceptance tests OK
Mission armed at the beginning of the acceptance tests OK
Startup date of the float for acceptance tests 30/05/2017 10:00:00
Drift of the float clock during acceptance tests <3 s./day
Float battery voltage measure at the end of the acceptance tests 10.6
Float internal vacuum measured during the acceptance tests 650
Comment on internal vacuums measured during the acceptance tests OK
General comments on the acceptance tests OK
Comment on float visual inspection done during the pre-deployment check OK
Comment on ballast visual inspection done during the pre-deployment check OK
Float clock set during the pre-deployment check OK
Float battery voltage measured during the pre-deployment check 10.6
Float internal vacuum measured during the pre-deployment check 625
Comment on internal vacuums measured during the acceptance tests OK
Spy mode set to ON during the pre-deployment check OK
Show mode set to OFF during the pre-deployment check OK
Mission armed during the pre-deployment check OK
General comments on the pre-deployment check FLOAT CHECKED AND PROGRAMMED ON 27/05/2019
Period of the pressure checks during the float ascent to surface 2
pression stab remontée 10
Platform type ARVOR
Threshold used by the float to stop ascent speed control and pump actions. 10
Type of sensor from L22 SeaVox Device Catalogue TOOL0669
Number of cycles for the first mission of a double mission Argos float (Arvor ARN 2013) 500
Comment on float internal checks before deployment (valve and pump actions, argos transmission check) OK
Float deployment height (m) 1.5
Ship speed during float deployment (kts) 1.5
Wind speed during float deplayment (Beaufort) 1
Sea state during float deployment (calm, smooth, slight, moderate, rough, very rough, high, very high, phenomenal) Smooth (0.1 to 0.5 m)
Float clock value set during acceptance tests (dd/mm/yyyy hh:mm) ('!TI') 04/05/2017 12:00:00
PRES measurement done before acceptance deployment 0
TEMP measurement done before acceptance deployment 22.278
PSAL measurement done before acceptance deployment 11
Comment on float internal checks before acceptance deployment (valve and pump actions, argos transmission check) OK
Buoyancy description before acceptance deployment Water @ top of P sensor
Buoyancy description after acceptance deployment Water @ 0.5 cm above top of P sensor
PRES measurement done after acceptance deployment 0
TEMP measurement done after acceptance deployment 25.235
PSAL measurement done after acceptance deployment 13
Float firmware version at pre-deployment 5605B04
Float clock value set during pre-deployment (dd/mm/yyyy hh:mm) ('!TI') 27/05/2019 13:18:00
PRES measurement done during pre-deployment tests -1
TEMP measurement done during pre-deployment tests 16.782
PSAL measurement done during pre-deployment tests 9
Date of last update of the tech data of the platform 09/07/2021 17:37:10
Configuration phases
Total time of a cycle : descent + parking + ascent + surface Preset duration of the down time (start of descent to start of ascent) Preset duration of the up time (start of ascent to start of descent) Pressure of subsurface drifts Deepest pressure sampled in the ascending profile
120 1000 2000
120 1000 2000
Sensors
Name Maker Model Serial number Units Accuracy Resolution
CTD_PRES DRUCK DRUCK 10595870
CTD_TEMP SBE SBE41CP 9600
CTD_CNDC SBE SBE41CP 9600
Physical parameters
Name Units Accuracy Resolution
CTD_PRES decibar 2.4 0.1
CTD_TEMP degree_Celsius 0.002 0.001
CTD_CNDC mS.cm-1 0.005 0.001
Calibrations
Parameter Equation Coefficients Comment
PRES
TEMP
PSAL
Technical parameters Details