Status
Comment
Login
Code 6903076
Name ARVOR Profiling Float
Description E-ARISE
Project E-ARISE
Institution IFREMER, Institut Français de Recherche pour l'Exploitation de la Mer
Data Assembly Center IF : CORIOLIS
Activity Active
Status
Comment
First station date 11/12/2020 10:25:00
Last station date 10/06/2021 05:35:20
Float cycles 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, 1, 0
Stations in Ascii, in Netcdf
Trajectory data in Ascii, in Netcdf
Graphics of individual profiles Verticals profiles, Immersion profiles
Map
Float Argo trajectory for platform 6903076
(C) Coriolis data centre - 2021.06.13
T/S Diagram
Section chart
Overlayed profiles
Waterfall profiles
Configuration
Profiler TYPE PROVOR
Profiler VERSION 5.49
Profiler CYCLE PERIOD 10
Profiler IMMERSION DRIFT PERIOD 180
Profiler LAUNCH DATETIME 11/12/2020 08:35:00
Profiler LAUNCH LATITUDE 29.1665
Profiler LAUNCH LONGITUDE -19.0024
Profiler PROBE CODE 878
Profiler RECORDER CODE 64
Profiler EXPERIMENT ID E-ARISE
Profiler PARKING DEPTH 1000
Profiler PROFILE DEPTH 2000
Platform activity flag A
The last valid station id of the platform 77636786
Bathy 4417
Profiler configuration - Reference day 1
Data centre in charge of platform data processing IF
Positioning system GPS
Positioning system IRIDIUM
Transmission identifier (ARGOS, ORBCOMM, etc.) 022633
The telecommunications system used IRIDIUM
Model of the float ARVOR
The name of the manufacturer NKE
Instrument type AI3500-20FR002
Direction of the profiles B
Name of the principal investigator Guillaume MAZE
Quality on launch date, time and location 1
Date (UTC) of the first descent of the float. 11/12/2020 08:49:00
Quality on start date 1
Identifier of the deployment platform RAMON MARGALEF
Identifier of stations used to verify the first profile No
The number of times this cycle repeats 1
Name of the cruise RAPROCEAN
Date of last update of the metadata of the platform 14/12/2020 20:00:00
Date of last update of the trajectory of the platform 10/06/2021 09:36:51
Version number of the data handbook 1.2
Theoretical time of end of ascent to surface 6
Profiler configuration - Periode de transmission en fin de vie (minute) 180
Profiler configuration - Duree maxi d activation ev en surface (cs) 800
Profiler configuration - Volume transfere par l ev maxi autorise en profondeur (cm3) 11
Profiler configuration - Duree maxi d activation pompe en profondeur (cs) 290
Profiler configuration - Duree maxi d activation pompe en remontee (cs) 720
Profiler configuration - Dur?e nominale d activation pompe en emergence (cs) 22000
Profiler configuration - Tolerance sur l atteinte de la pression de consigne (dBar) 30
Profiler configuration - Pression maxi a ne pas depasser (dBar) 2100
Profiler configuration - Pression de debut de reduction de la duree d activation ev en surface (dBar) 1
Profiler configuration - Critere de pression de debut de plongee (dBar) 7
Profiler configuration - Nbre de positions hors tolerance autorise en derive conduisant a repositionnement 2
Profiler configuration - Mode de gestion de l echouage en descente a pression de derive 0
Profiler configuration - Critere d echouage: volume cumule (cm3) 36
Profiler configuration - Pression en dessous de laquelle le flotteur reste pose en attente profil remontee (dBar) 200
Profiler configuration - Diminution de la pression visee en cas d echouage (dBar) 100
Profiler configuration - Tolerance sur maintien de la pression de consigne (dBar) 50
Profiler configuration - Mode d acquisition de la mesure 1
Profiler configuration - Periode d alternance profil - si=1, pas d alternance (jour) 1
Profiler configuration - Profondeur de profil alterne (dBar) 2000
Profiler configuration - Vitesse moyenne descente (mm/s) 25
Profiler configuration - Increment de profondeur de consigne a chaque cycle (dBar) 0
Profiler configuration - Timeout modem iridium (minute) 120
Profiler configuration - Coefficient de calibrage pression A 1.438
Profiler configuration - Coefficient de calibrage pression B -169.46
Firmware version 5900A06
The manual version for the float 33-16-058
A standard format number to describe the data format for each float 102005
The configuration of battery packs in the float 2 WILPA1621A
The type of controller board I535
The serial number of the primary controller board C200131-0019
The float owner IFREMER
The operating institution of the float IFREMER
Delay Before Mission 30
Period Descent Profile 0
Period Ascent Profile 10
INTERMEDIATE SURFACE THRESHOLD 400
Depth intermediate threshold 1400
Surface Slice Thickness 1
Intermediate Slice Thickness 2
Depth Slice Thickness 5
Optode type 0
Average ascent speed 90
CTD cut-off pressure 2
maximum cycles 500
Category of instrument FLOAT
Id of the sail connector 20FR002
Number of the bluetooth connection C200107-0012-AC
Firmware checksum DBD3
Comment on float visual inspection done just before deployment OK
Comment on ballast visual inspection done just before deployment OK
Startup date of the float 11/12/2020 08:19:00
Description of the float buoyancy just after deployment OK
Name of the deployment operator Alberto Gonzalez Santana
Method used to deploy the float Crane + releasable hook
Comment on the float deployment 2
Comment on float visual inspection done during acceptance tests OK
Comment on ballast visual inspection done during acceptance tests OK
Float firmware version during acceptance tests 5900A06
Float firmware checksum during acceptance tests DBD3
Spy mode set to ON at the beginning of the acceptance tests OK
Show mode set to OFF at the beginning of the acceptance tests OK
Mission armed at the beginning of the acceptance tests OK
Drift of the float clock during acceptance tests N/A
General comments on the acceptance tests OK
Comment on float visual inspection done during the pre-deployment check OK
Comment on ballast visual inspection done during the pre-deployment check OK
Float clock set during the pre-deployment check NO
Float battery voltage measured during the pre-deployment check 10.7
Float internal vacuum measured during the pre-deployment check 597
Comment on internal vacuums measured during the acceptance tests 0K
Spy mode set to ON during the pre-deployment check OK
Show mode set to OFF during the pre-deployment check OK
Mission armed during the pre-deployment check OK
General comments on the pre-deployment check FLOAT CHECKED AND PROGRAMMED 30/10/2020
Period of the pressure checks during the float ascent to surface 2
pression stab remontée 10
Platform type ARVOR
Time delay between each new attempt to descend when the float is stuck at the surface. 10
Threshold used by the float to stop ascent speed control and pump actions. 10
1 if the float transmits hydraulic data at the end of the cycle, 0 otherwise. 1
Period of the pressure checks during the float descent. 5
If the float vertical motion, is less than this threshold, the float makes buoyancy adjustments. 3
Delay before a second Iridium session performed by the float just before diving for a new cycle. 20
Number of cycles for the first mission of a double mission Argos float (Arvor ARN 2013) 500
Comment on float internal checks before deployment (valve and pump actions, argos transmission check) OK
Float deployment height (m) 0
Ship speed during float deployment (kts) 1
Wind speed during float deplayment (Beaufort) 3
Sea state during float deployment (calm, smooth, slight, moderate, rough, very rough, high, very high, phenomenal) slight (0.5 to 1.25m)
Comment on float internal checks before acceptance deployment (valve and pump actions, argos transmission check) OK
Float firmware version at pre-deployment 5900A06
Float clock value set during pre-deployment (dd/mm/yyyy hh:mm) ('!TI') 30/10/2020 16:36:00
PRES measurement done during pre-deployment tests -15
TEMP measurement done during pre-deployment tests 17.632
Float waiting period before the surface ResetOffset CTD command (Arvor ARN 2013) 0
Timeout for GPS acquisition. 45
Cycle periodicity of the 'in air measurement' phase. 1
Sampling period during the 'in air measurement' phase. 30
Duration of the 'in air measurement' phase. 5
Duration of the last pump action of the buoyancy acquisition phase when a 'in air measurement' phase is programmed (in centi-seconds). 22000
The float has an additonial stick for air measurement (yes/no) no
Maximum delay (in days) since the last ice evasion date to raise a new ice evasion. 10
Max delay (in days) of no transmission due to the ice detection algorithm. This param is used to disable the ice detection algorithm for a float which always aborts its ascent (probably because of some error in its ISA algorithm config param). 90
Number of successful temperature comparisons for the ISA algorithm to state that ice is present. 3
Start pressure of the TEMP comparison. 50
Stop pressure of the TEMP comparison. 20
Ice temperature where profiles are aborted because of ice formation conditions. -1790
Pressure threshold to start the slow ascent speed phase. 150
Pressure acquisition period of the ice detection algorithm. 2
Min pressure difference for pump action during ISA ice detection algorithm. 4
Pump action duration during ISA ice detection algorithm. 500
Timeout to acquire a GPS fix during ice detection. 5
Timeout of the first Iridium lock during ice detection. 10
Timeout without vertical motion during ice detection. 30
Min pressure difference to end a buoyancy inversion phase after a cycle abort due to ice detection. 20
Transfered volume per valve action during a buoyancy inversion phase. 9
Min cumulated volume by valve actions during a buoyancy inversion phase for grounding on descent detection. 900
Offset, added to theoretical internal vacuum for self test threshold (YLA5900A05) 50
Date of last update of the tech data of the platform 10/06/2021 09:45:44
Flag to transmit salinity correction of RBR sensor (stored in TEMP_CNDC) 1
Configuration phases
Total time of a cycle : descent + parking + ascent + surface Preset duration of the down time (start of descent to start of ascent) Preset duration of the up time (start of ascent to start of descent) Pressure of subsurface drifts Deepest pressure sampled in the ascending profile
240 1000 2000
240 1000 2000
Sensors
Name Maker Model Serial number Units Accuracy Resolution
CTD_PRES RBR RBR_PRESA 203794
CTD_TEMP RBR RBR_ARGO3 203794
CTD_CNDC RBR RBR_ARGO3 203794
Physical parameters
Name Units Accuracy Resolution
CTD_PRES decibar 1 dbar 0.02 dbar
CTD_TEMP degree_Celsius 0.002 degC 0.00005 degC
CTD_CNDC psu 0.003 psu 0.001 psu
CTD_CNDC degree_Celsius
Calibrations
Parameter Equation Coefficients Comment
PRES
TEMP
PSAL
TEMP_CNDC
Technical parameters Details