Status
Comment
Login
Code 6903866
Name ARVOR Profiling Float
Description ARGO Bulgaria
Project Argo Bulgary
Institution Institute of Oceanology, Bulgarian Academy of Sciences (IO-BAS)
Data Assembly Center IF : CORIOLIS
Activity Active
Status
Comment
First station date 22/11/2020 22:15:00
Last station date 12/06/2021 02:51:30
Float cycles 41, 40, 39, 38, 37, 36, 35, 34, 33, 32, 31, 30, 29, 28, 27, 26, 25, 24, 23, 22, 21, 20, 19, 18, 17, 16, 15, 14, 13, 12, 11, 10, 9, 8, 7, 6, 5, 4, 3, 2, 1, 0
Stations in Ascii, in Netcdf
Trajectory data in Ascii, in Netcdf
Graphics of individual profiles Verticals profiles, Immersion profiles
Map
Float Argo trajectory for platform 6903866
(C) Coriolis data centre - 2021.06.16
T/S Diagram
Section chart
Overlayed profiles
Waterfall profiles
Configuration
Profiler TYPE PROVOR
Profiler VERSION 5.47
Profiler CYCLE PERIOD 10
Profiler CYCLE PERIOD 5
Profiler IMMERSION DRIFT PERIOD 360
Profiler LAUNCH DATETIME 22/11/2020 21:14:00
Profiler LAUNCH LATITUDE 42.5006
Profiler LAUNCH LONGITUDE 28.8317
Profiler PROBE CODE 844
Profiler RECORDER CODE 64
Profiler EXPERIMENT ID Argo Bulgary
Profiler PARKING DEPTH 1000
Profiler PARKING DEPTH 750
Profiler PROFILE DEPTH 1500
Profiler PROFILE DEPTH 2000
Platform activity flag A
The last valid station id of the platform 77661005
Bathy 1500
Profiler configuration - Reference day 2
Data centre in charge of platform data processing IF
Positioning system GPS
Positioning system IRIDIUM
Transmission identifier (ARGOS, ORBCOMM, etc.) 035576
The telecommunications system used IRIDIUM
Model of the float ARVOR
The name of the manufacturer NKE
Instrument type AI2600-20EU014
Direction of the profiles B
Name of the principal investigator Violeta Slabakova
Quality on launch date, time and location 1
Date (UTC) of the first descent of the float. 22/11/2020 21:30:00
Quality on start date 1
Identifier of the deployment platform Akademik
Identifier of stations used to verify the first profile yes
The number of times this cycle repeats 1
Name of the cruise Monitoring 112020 (15AK3112020)
Date of last update of the metadata of the platform 24/11/2020 14:00:00
Date of last update of the trajectory of the platform 12/06/2021 05:33:43
Version number of the data handbook 1.2
Theoretical time of end of ascent to surface 3
Profiler configuration - Periode de transmission en fin de vie (minute) 180
Profiler configuration - Duree maxi d activation ev en surface (cs) 800
Profiler configuration - Volume transfere par l ev maxi autorise en profondeur (cm3) 11
Profiler configuration - Duree maxi d activation pompe en profondeur (cs) 290
Profiler configuration - Duree maxi d activation pompe en remontee (cs) 720
Profiler configuration - Dur?e nominale d activation pompe en emergence (cs) 27000
Profiler configuration - Tolerance sur l atteinte de la pression de consigne (dBar) 30
Profiler configuration - Pression maxi a ne pas depasser (dBar) 2100
Profiler configuration - Pression de debut de reduction de la duree d activation ev en surface (dBar) 1
Profiler configuration - Critere de pression de debut de plongee (dBar) 7
Profiler configuration - Nbre de positions hors tolerance autorise en derive conduisant a repositionnement 2
Profiler configuration - Mode de gestion de l echouage en descente a pression de derive 0
Profiler configuration - Critere d echouage: volume cumule (cm3) 36
Profiler configuration - Pression en dessous de laquelle le flotteur reste pose en attente profil remontee (dBar) 200
Profiler configuration - Diminution de la pression visee en cas d echouage (dBar) 100
Profiler configuration - Tolerance sur maintien de la pression de consigne (dBar) 50
Profiler configuration - Mode d acquisition de la mesure 1
Profiler configuration - Periode d alternance profil - si=1, pas d alternance (jour) 1
Profiler configuration - Profondeur de profil alterne (dBar) 2000
Profiler configuration - Vitesse moyenne descente (mm/s) 25
Profiler configuration - Increment de profondeur de consigne a chaque cycle (dBar) 0
Profiler configuration - Timeout modem iridium (minute) 120
Profiler configuration - Coefficient de calibrage pression A 1.351
Profiler configuration - Coefficient de calibrage pression B 41.44
Firmware version 5900A05
The manual version for the float 33-16-033_ rev11
The configuration of battery packs in the float 2 x WILPA1621A
The type of controller board I535
The serial number of the primary controller board C200131-0053
The float owner IO-BAS
The operating institution of the float Euro-Argo
Delay Before Mission 30
Period Descent Profile 0
Period Ascent Profile 10
INTERMEDIATE SURFACE THRESHOLD 100
Depth intermediate threshold 500
Surface Slice Thickness 1
Intermediate Slice Thickness 2
Depth Slice Thickness 5
Optode type 0
Average ascent speed 90
CTD cut-off pressure 2
maximum cycles 500
Category of instrument FLOAT
Number of the bluetooth connection 200107-0146-AC
Firmware checksum 2C97
Comment on float visual inspection done just before deployment OK
Startup date of the float 22/11/2020 21:00:00
Description of the float buoyancy just after deployment OK
Name of the deployment operator Anatoli Apostolov
Method used to deploy the float manual
Comment on float visual inspection done during acceptance tests OK
Comment on ballast visual inspection done during acceptance tests OK
Float firmware version during acceptance tests 5900A05
Float firmware checksum during acceptance tests 2C97
Float clock set at the beginning of the acceptance tests N/A
Float battery voltage measured at the beginning of the acceptance tests 10.9
Spy mode set to ON at the beginning of the acceptance tests N/A
Show mode set to OFF at the beginning of the acceptance tests OK
Mission armed at the beginning of the acceptance tests OK
Drift of the float clock during acceptance tests N/A
Float battery voltage measure at the end of the acceptance tests 10.8
Float internal vacuum measured during the acceptance tests 598
Comment on internal vacuums measured during the acceptance tests ok
General comments on the acceptance tests oK, ready to deploy
Comment on float visual inspection done during the pre-deployment check OK
Comment on ballast visual inspection done during the pre-deployment check OK
Float clock set during the pre-deployment check N/A
Float battery voltage measured during the pre-deployment check 10.8
Float internal vacuum measured during the pre-deployment check 598
Comment on internal vacuums measured during the acceptance tests ok
Spy mode set to ON during the pre-deployment check N/A
Show mode set to OFF during the pre-deployment check OK
Mission armed during the pre-deployment check OK
General comments on the pre-deployment check oK, ready to deploy
Period of the pressure checks during the float ascent to surface 2
pression stab remontée 10
Platform type ARVOR
Time delay between each new attempt to descend when the float is stuck at the surface. 30
Threshold used by the float to stop ascent speed control and pump actions. 10
1 if the float transmits hydraulic data at the end of the cycle, 0 otherwise. 1
Period of the pressure checks during the float descent. 5
If the float vertical motion, is less than this threshold, the float makes buoyancy adjustments. 3
Delay before a second Iridium session performed by the float just before diving for a new cycle. 0
Type of sensor from L22 SeaVox Device Catalogue TOOL0669
Type of sensor from L22 SeaVox Device Catalogue TOOL0837
Number of cycles for the first mission of a double mission Argos float (Arvor ARN 2013) 500
Float clock value set during acceptance tests (dd/mm/yyyy hh:mm) ('!TI') N/A
Buoyancy description after acceptance deployment Water @ 0.5 cm above top of P sensor
PRES measurement done after acceptance deployment 0
TEMP measurement done after acceptance deployment 13.927
PSAL measurement done after acceptance deployment 0
Float firmware version at pre-deployment 5900A05
Float clock value set during pre-deployment (dd/mm/yyyy hh:mm) ('!TI') 14/10/20, 10h 57m 28s
PRES measurement done during pre-deployment tests 0
TEMP measurement done during pre-deployment tests 13.927
PSAL measurement done during pre-deployment tests 0
Float waiting period before the surface ResetOffset CTD command (Arvor ARN 2013) 0
Timeout for GPS acquisition. 45
Cycle periodicity of the 'in air measurement' phase. 0
Sampling period during the 'in air measurement' phase. 30
Duration of the 'in air measurement' phase. 5
Duration of the last pump action of the buoyancy acquisition phase when a 'in air measurement' phase is programmed (in centi-seconds). 33000
Maximum delay (in days) since the last ice evasion date to raise a new ice evasion. 0
Offset, added to theoretical internal vacuum for self test threshold (YLA5900A05) 50
Date of last update of the tech data of the platform 12/06/2021 06:34:28
Configuration phases
Total time of a cycle : descent + parking + ascent + surface Preset duration of the down time (start of descent to start of ascent) Preset duration of the up time (start of ascent to start of descent) Pressure of subsurface drifts Deepest pressure sampled in the ascending profile
120 750 1500
240 1000 2000
Sensors
Name Maker Model Serial number Units Accuracy Resolution
CTD_PRES DRUCK DRUCK_2900PSIA 11518250
CTD_TEMP SBE SBE41CP_V7.2.5 12956
CTD_CNDC SBE SBE41CP_V7.2.5 12956
Physical parameters
Name Units Accuracy Resolution
CTD_PRES dbar 2.4 dbar 0.1 dbar
CTD_TEMP degC 0.002 degC 0.001 degC
CTD_CNDC psu 0.005 psu 0.001 psu
Calibrations
Parameter Equation Coefficients Comment
PRES
TEMP
PSAL
Technical parameters Details